Corridor-Drava-Mura-Raba-Danube-gr
mobilitatis omni legend railway network slovenia italy austria hungary croatia
Current corridor length & type

575.9 km |
Single-track |
partly electrified |

Mostly single track corridor, partly electrified.

Upgrade proposal

Double-track |
All electrified |
Speeds up to 160km/h |
Multi level crossings |

Upgrade proposal for this corridor is completely double-track, all lines electrified, with speeds up to 160 km/h and obligatory multi level crossings.

Corridor current lines
Osijek–Varaždin [250 km]
43.4%
Varaždin–Čakovec–SB Slovenia [20 km]
3.5%
Ormož–Središče–SB Croatia [11.6 km]
2%
Ormož–Hodoš–SB Hungary [50 km]
8.7%
Szombathely–Zalaegerszeg–SB Slovenia [96.2 km]
16.7%
Szombathely–Bögöt [17 km]
2.9%
Bögöt–Rajka–SB Slovakia [109.2 km]
19%
Bratislava–Rusovce–SB Hungary [22 km]
3.8%
Osijek–Varaždin–Murska Sobota–Szombathely/leg Graz–Bratislava. Drava–Mura–Raba–Danube Corridor

Leave a comment

Minimum 4 characters